top of page
Writer's pictureDaniel Eisenbraun

Week 25 : 2/6/2023 - 2/13/2023

This week started with the creation of a concurrent Timeline Excel file reflecting the actual progression and embedded into the website page under our proposed timeline.


The Transistor Array location was updated on the Engineering Specifications and Block Diagrams on the website to reflect the changes made to our design.



The weekly meetings log on the website was updated and is now up to date as of 2/6/2023.


Daniel assisted in finishing the wiring harness by soldering all connections to the fans from the 4-Pin IP67 Cables. All fans are now wired in accordance with the Transistor Control Circuits tested in prior weeks. Assisted with troubleshooting the Thermistor Code/Circuit and IR Sensor Codes, and provided materials required for testing the battery level monitoring circuit (see Group Log for Details). During testing the Pico was damaged, a replacement was ordered and received on 2/12/2023.




13 views0 comments

Recent Posts

See All

Commentaires


bottom of page